Claims

A year of Learning through REAL Projects had no clear impact on Year 7 pupils' literacy attainment

Claim · All claims
Evidence · 1 study · causal r2 · q3 · i1 small
Currency · newest study 2016 · not yet checked against its sources · not reviewed by a person

Subclaims

Reading the evidence codes

q is the design tier, i the impact, n the sample, and the kind with its r the rigour judged within that kind: what each code means.

This claim: no standardized effect is recorded in observations/ for it yet, so no benchmark reading is possible.

q3 i1 Pupils in intervention schools showed no detectable literacy benefit relative to control pupils; the printed effect size of -0.13 was small and its confidence interval crossed zero. → Menzies 2016

Evidence

Menzies 2016

Menzies, V., Hewitt, C., Kokotsaki, D., Collyer, C. and Wiggins, A. (2016). Project Based Learning: Evaluation report and executive summary. Education Endowment Foundation. https://educationendowmentfoundation.org.uk/public/files/Projects/EEF_Project_Protocol_ProjectBasedLearning.pdf

q3 · i1 · causal · r2

A two-armed cluster RCT with 12 intervention and 12 control schools measured literacy with the Progress in English 12 assessment after one year of delivery. Table 1 prints an effect size of -0.13 (95% CI -0.31, 0.05), equivalent to -2 months' progress, so no literacy benefit was detected.

"The trial results did not find that the PBL progr amme had an impact either on the pupils’ literacy performance (as measured by Progress in Eng lish 12 tests), engagement, or attendance."

Discussion

Page metadata
Field Value
status review
generated by process:wiki-ingest on 2026-11-01
trust unverified — no one has confirmed this page's content

Frontmatter is the page's machine-readable record — see the Schema & Guide.