Match the input-parameter estimation method (managerial estimates vs. time study) to the accuracy the simulation purpose requires¶
Strategy · All strategies
Evidence · no claims cited
Description¶
The report advises choosing how to determine simulation input parameters according to the purpose of the run. For a manager seeking better understanding of minor changes, estimating values from his own experience may suffice; "When a high degree of accuracy is needed; e.g., if thesimulation is being used to develop budget estimates, a timestudy may be necessary." A descriptive model of the proposed configuration should be developed before the time study, which can then both estimate parameters and validate the model, including statistically testing assumptions such as whether interview length depends on the applicant's occupation.
Design Implications¶
Context¶
Requirements¶
- A detailed descriptive model of the proposed office configuration should be developed prior to conducting a time study
Constraints¶
- If the proposed office configuration is sufficiently different from the present one, a time study may not be possible, and accuracy is then limited by the predictive technique used
Target Learners¶
- Employment Service planners and managers conducting simulation studies
Target Learning Goals¶
- Estimating simulation input parameters at an appropriate level of accuracy and cost
Affordances¶
Related Strategies¶
- Use simulation as a non-threatening alternative to direct experimentation when testing office reorganizations
- Initialize BKT parameters from simulated student data when no human data is available
- Estimate a skill's minimum BKT-BF RSS a priori from dim, n, and percent_correct before running the full grid search
Examples¶
-
Key Sources¶
- Cohen, Malcolm S. (1975). A Study of On-Line Use of Job Information in Employment Service Local Offices. Volume II: A Simulation Study. https://eric.ed.gov/?id=ED115779
Page metadata
| Field | Value |
|---|---|
type |
strategy |
id |
match-input-estimation-method-to-required-accuracy |
title |
Match the input-parameter estimation method (managerial estimates vs. time study) to the accuracy the simulation purpose requires |
description |
The report advises choosing how to determine simulation input parameters according to the purpose of the run. |
status |
review |
generated |
by claude/unspecified on 2026-09-25 |
trust |
unverified — no one has confirmed this page's content |
sources |
1 — cohen-1975 |
Frontmatter is the page's machine-readable record — see the Schema & Guide.