Getting-started sequence: build authentic partnerships, assess intervention-context fit, then budget for continuous revision¶
Strategy · All strategies
Evidence · 1 claim (1 for) · 1 study (1 review),q2· 0 of 1 report an effect size · 1 claim rests on one study
Description¶
The article's concrete recommendation for researchers and practitioners beginning an implementation project. It prescribes a sequence: "education researchers and practitioners should first cultivate authentic partnerships with local stakeholders—including students, teachers, administrators, and families—to clearly understand and articulate local needs"; then collaboratively explore multiple intervention options and rigorously assess compatibility with the unique cultural, structural, and systemic characteristics of the context; and plan so as to explicitly budget time, resources, and personnel for continuous revision based on ongoing feedback.
Design Implications¶
Context¶
Requirements¶
- Partnerships must be authentic and formed before intervention selection; compatibility assessment must cover cultural, structural, and systemic characteristics
Constraints¶
- The article cautions that even with simplified protocols, bridging the gap remains a significant undertaking requiring dedicated time, resources, and continuous attention
Target Learners¶
- Students in the local school communities whose needs anchor the intervention selection
Target Learning Goals¶
- Selecting interventions that fit local needs and sustaining them through adaptive revision
Affordances¶
- Epis Four Phase Education Implementation Framework
Claims¶
Related Strategies¶
- Five getting-started steps for building an integrated, school-based system of care
- Implementation-phase supports: staff engagement, communication and action plans, thought partnership, and self-assessment rubrics
- Pilot guidance documents with a small set of schools and iterate before wide dissemination
- Use university–district research partnerships to build district evaluation capacity and train practitioner-scholars
- Assess organisational readiness at the start of an adaptive learning implementation project by selecting context-relevant determinants from the framework
- Conduct stakeholder analysis before implementing a national competency framework
Examples¶
-
Key Sources¶
- Allen, S. E., Bardach, L., Jirout, J., Mackey, A., McCoy, D., Pesando, L. M., & Kizilcec, R. F. (2026). A practical implementation science framework for education. npj Science of Learning. https://doi.org/10.1038/s41539-026-00430-w
Page metadata
| Field | Value |
|---|---|
status |
review |
generated |
by process:wiki-ingest on 2026-10-27 |
trust |
unverified — no one has confirmed this page's content |
Frontmatter is the page's machine-readable record — see the Schema & Guide.